Fukushima Aquifer Protection
Posted: April 12, 2012 Filed under: Nuclear Leave a comment »
Initial sketch for dry encapsulation
1. The Levy can perhaps be installed simultaneous to the conc. injection pumping.
2. Ideally the work would be conducted via robots or at least with long boom pumps, workers shielded.
3. Humans should be cycled through the workspace only in rare occurrences for as brief exposure as possible.
4. I do not know the best containment material, this sketch assumes pumped concrete.
5. Levy 2 is also recommended at x distance from Levy 1.
